SC
3

Notifications

Design check on hold

ANU Solar tub — roll-hoop pitch 7.5 mm short. Cutting blocked until resolved.

Invoice overdue

SC-INV-10680 (Tilton) is 19 days overdue — $7,480.

5 materials below reorder

Prepreg twill, forged tow, Nomex 6mm, vac bag film, threaded pucks.

Job due soon

SC-J-26-0146 (Evo bonnet) due 18 Sep — in QA.

Prepreg out-life

Film adhesive LOT-AD-2555 expires 18 Oct — use or quarantine.

Batch certified

SC-J-26-0169 complete — 12 strakes serialised, COC issued.

PO received

SC-PO-26-044 received — bagging consumables back in stock.

Quote accepted

Xtreme Motorsport accepted SC-Q-26-018 — new job created.

Universal Dual Plane Canards — Batch ×20

Layup Active Production

Contract value

$58,500

Est. cost

$23,000

Margin

61%

Due

28 Oct 2026

Customer

Just Jap Distribution

Owner

Dylan M

Qty

20

Station

Layup Bay 1

Distributor batch — 20 canard sets.

Pre-machining design check

Verified against the mould / chassis jig before any carbon is cut.

Pending
CheckNominalActualTolResult
No design checks logged yet — added when the job enters Design.

Materials against this job

Consumed cost $3,190
MaterialLotQtyWasteCostState
CF-TW-210P Carbon Twill 3K 210gsm Prepreg LOT-PP-2609 26 m² 3.2 $2,314 Drawn
CF-SATIN-193 Carbon Satin 5HS 193gsm LOT-CF-2606 12 m² 1.4 $624 Drawn
RES-EPX-INF Epoxy Infusion Resin LOT-RS-2610 7 kg 0.5 $252 Drawn

Workshop routing

  1. Design
  2. CNC
  3. 3 Layup
  4. 4 Finishing
  5. 5 QA
  6. 6 Complete
Progress44%

Product

Universal Dual Plane Canards

AERO-CAND · Aero

List $2,925 · 9h labour · serialised

Activity

No activity yet.