SC
3

Notifications

Design check on hold

ANU Solar tub — roll-hoop pitch 7.5 mm short. Cutting blocked until resolved.

Invoice overdue

SC-INV-10680 (Tilton) is 19 days overdue — $7,480.

5 materials below reorder

Prepreg twill, forged tow, Nomex 6mm, vac bag film, threaded pucks.

Job due soon

SC-J-26-0146 (Evo bonnet) due 18 Sep — in QA.

Prepreg out-life

Film adhesive LOT-AD-2555 expires 18 Oct — use or quarantine.

Batch certified

SC-J-26-0169 complete — 12 strakes serialised, COC issued.

PO received

SC-PO-26-044 received — bagging consumables back in stock.

Quote accepted

Xtreme Motorsport accepted SC-Q-26-018 — new job created.

Xtreme GTR — Underfloor & Rear Diffuser (Stage 2)

Scheduled Active Bespoke

Contract value

$26,500

Est. cost

$10,500

Margin

60%

Due

08 Nov 2026

Customer

Xtreme Motorsport

Owner

Dylan M

Qty

1

Station

Stage 2 underfloor package.

Pre-machining design check

Verified against the mould / chassis jig before any carbon is cut.

Pending
CheckNominalActualTolResult
No design checks logged yet — added when the job enters Design.

Materials against this job

Consumed cost $0
MaterialLotQtyWasteCostState
No materials allocated yet.

Workshop routing

  1. 1 Design
  2. 2 CNC
  3. 3 Layup
  4. 4 Finishing
  5. 5 QA
  6. 6 Complete
Progress2%

Activity

No activity yet.