SC
3

Notifications

Design check on hold

ANU Solar tub — roll-hoop pitch 7.5 mm short. Cutting blocked until resolved.

Invoice overdue

SC-INV-10680 (Tilton) is 19 days overdue — $7,480.

5 materials below reorder

Prepreg twill, forged tow, Nomex 6mm, vac bag film, threaded pucks.

Job due soon

SC-J-26-0146 (Evo bonnet) due 18 Sep — in QA.

Prepreg out-life

Film adhesive LOT-AD-2555 expires 18 Oct — use or quarantine.

Batch certified

SC-J-26-0169 complete — 12 strakes serialised, COC issued.

PO received

SC-PO-26-044 received — bagging consumables back in stock.

Quote accepted

Xtreme Motorsport accepted SC-Q-26-018 — new job created.

Insight Motorsport — Dash & Interior Trim

Finishing Active Bespoke

Contract value

$2,400

Est. cost

$960

Margin

60%

Due

25 Sept 2026

Customer

Insight Motorsport

Owner

Aisha K

Qty

1

Station

Finishing

Dry carbon dash + trim.

Pre-machining design check

Verified against the mould / chassis jig before any carbon is cut.

Pending
CheckNominalActualTolResult
No design checks logged yet — added when the job enters Design.

Materials against this job

Consumed cost $0
MaterialLotQtyWasteCostState
No materials allocated yet.

Workshop routing

  1. Design
  2. CNC
  3. Layup
  4. 4 Finishing
  5. 5 QA
  6. 6 Complete
Progress85%

Product

Universal Carbon Dash

INT-UCDASH · Interior

List $2,400 · 9h labour

Activity

No activity yet.