Quickstep — Aerospace Bracket Tooling
Contract value
$36,000
Est. cost
$14,500
Margin
60%
Due
10 Dec 2026
Customer
Quickstep Holdings
Owner
Tom R
Qty
1
Station
Design
Invar-alternative tooling for aero bracket.
Pre-machining design check
Verified against the mould / chassis jig before any carbon is cut.
| Check | Nominal | Actual | Tol | Result |
|---|---|---|---|---|
| Bracket tool datumTooling datum verified. | A-datum | A-datum | ±0.1 mm | Pass |
Materials against this job
Consumed cost $0| Material | Lot | Qty | Waste | Cost | State |
|---|---|---|---|---|---|
| No materials allocated yet. | |||||
Workshop routing
- 1 Design
- 2 CNC
- 3 Layup
- 4 Finishing
- 5 QA
- 6 Complete
Activity
No activity yet.