SC
3

Notifications

Design check on hold

ANU Solar tub — roll-hoop pitch 7.5 mm short. Cutting blocked until resolved.

Invoice overdue

SC-INV-10680 (Tilton) is 19 days overdue — $7,480.

5 materials below reorder

Prepreg twill, forged tow, Nomex 6mm, vac bag film, threaded pucks.

Job due soon

SC-J-26-0146 (Evo bonnet) due 18 Sep — in QA.

Prepreg out-life

Film adhesive LOT-AD-2555 expires 18 Oct — use or quarantine.

Batch certified

SC-J-26-0169 complete — 12 strakes serialised, COC issued.

PO received

SC-PO-26-044 received — bagging consumables back in stock.

Quote accepted

Xtreme Motorsport accepted SC-Q-26-018 — new job created.

RP968 A90 Supra — Custom Bonnet & Ducting

Layup Active Bespoke

Contract value

$24,000

Est. cost

$9,600

Margin

60%

Due

06 Oct 2026

Customer

RP968 Fabrication

Owner

Dylan M

Qty

1

Station

Layup Bay 2

Dry carbon bonnet + brake ducts.

Pre-machining design check

Verified against the mould / chassis jig before any carbon is cut.

Pending
CheckNominalActualTolResult
No design checks logged yet — added when the job enters Design.

Materials against this job

Consumed cost $1,400
MaterialLotQtyWasteCostState
CF-UD-300P Carbon UD 300gsm Prepreg LOT-PP-2607 12 m² 1.5 $1,152 Drawn
CORE-PVC10 PVC Foam Core 10mm LOT-PV-2557 2 sheet 0 $248 Drawn

Workshop routing

  1. Design
  2. CNC
  3. 3 Layup
  4. 4 Finishing
  5. 5 QA
  6. 6 Complete
Progress48%

Activity

Layup started — dry carbon bonnet.

Dylan M · 12 Sept, 09:00 am