SC
3

Notifications

Design check on hold

ANU Solar tub — roll-hoop pitch 7.5 mm short. Cutting blocked until resolved.

Invoice overdue

SC-INV-10680 (Tilton) is 19 days overdue — $7,480.

5 materials below reorder

Prepreg twill, forged tow, Nomex 6mm, vac bag film, threaded pucks.

Job due soon

SC-J-26-0146 (Evo bonnet) due 18 Sep — in QA.

Prepreg out-life

Film adhesive LOT-AD-2555 expires 18 Oct — use or quarantine.

Batch certified

SC-J-26-0169 complete — 12 strakes serialised, COC issued.

PO received

SC-PO-26-044 received — bagging consumables back in stock.

Quote accepted

Xtreme Motorsport accepted SC-Q-26-018 — new job created.

Internal — Aero Mirror Tooling & First Article (R&D)

Layup Active Internal

Contract value

Est. cost

$4,800

Margin

Due

12 Oct 2026

Customer

Internal

Owner

Dylan M

Qty

1

Station

Layup Bay 1

R&D tooling for pre-release mirror — feeds distribution range.

Pre-machining design check

Verified against the mould / chassis jig before any carbon is cut.

Pending
CheckNominalActualTolResult
No design checks logged yet — added when the job enters Design.

Materials against this job

Consumed cost $1,188
MaterialLotQtyWasteCostState
CF-SPREAD-80 Spread-tow Carbon 80gsm LOT-CF-2605 6 m² 0.8 $768 Drawn
TOOL-BOARD Tooling Board (Ureol) 40mm 1 block 0 $420 Drawn

Workshop routing

  1. Design
  2. CNC
  3. 3 Layup
  4. 4 Finishing
  5. 5 QA
  6. 6 Complete
Progress55%

Product

Universal Aero Mirrors

AERO-MIRR · Aero

List $3,300 · 10h labour · serialised

Activity

No activity yet.