SC
3

Notifications

Design check on hold

ANU Solar tub — roll-hoop pitch 7.5 mm short. Cutting blocked until resolved.

Invoice overdue

SC-INV-10680 (Tilton) is 19 days overdue — $7,480.

5 materials below reorder

Prepreg twill, forged tow, Nomex 6mm, vac bag film, threaded pucks.

Job due soon

SC-J-26-0146 (Evo bonnet) due 18 Sep — in QA.

Prepreg out-life

Film adhesive LOT-AD-2555 expires 18 Oct — use or quarantine.

Batch certified

SC-J-26-0169 complete — 12 strakes serialised, COC issued.

PO received

SC-PO-26-044 received — bagging consumables back in stock.

Quote accepted

Xtreme Motorsport accepted SC-Q-26-018 — new job created.

Universal Splitter — Production Run ×10

CNC Active Production

Contract value

$39,000

Est. cost

$15,000

Margin

62%

Due

30 Oct 2026

Customer

Insight Automotive Group

Owner

Priya S

Qty

10

Station

CNC

Distributor batch — 10 splitters.

Pre-machining design check

Verified against the mould / chassis jig before any carbon is cut.

All pass
CheckNominalActualTolResult
Splitter plan profileNest confirmed to Rev C. Rev C Rev C Pass

Materials against this job

Consumed cost $1,114
MaterialLotQtyWasteCostState
CF-TW-200 Carbon Twill 2x2 200gsm (dry) LOT-CF-2608 18 m² 0 $756 Allocated
RES-EPX-INF Epoxy Infusion Resin LOT-RS-2610 5 kg 0 $180 Allocated
PNT-2KCLR 2K Clearcoat 2 L 0 $178 Allocated

Workshop routing

  1. Design & nestDesign · 5.5/6h Done
  2. 2 CNC cut pliesCNC · 4/12h Active
  3. 3 Layup & debulkLayup · 0/18h Pending
  4. 4 Cure (oven)Oven · 0/7h Pending
  5. 5 Finishing & clearFinishing · 0/9h Pending
  6. 6 QA & serialiseQA · 0/5h Pending
Progress22%

Product

Universal Splitter

AERO-USPL · Aero

List $3,900 · 14h labour · serialised

Activity

No activity yet.