GAS — Aircraft Interior Panel Prototype
Contract value
$21,000
Est. cost
$8,200
Margin
61%
Due
01 Dec 2026
Customer
Global Aircraft Services
Owner
Tom R
Qty
1
Station
Design
Prototype interior panel, prepreg.
Pre-machining design check
Verified against the mould / chassis jig before any carbon is cut.
| Check | Nominal | Actual | Tol | Result |
|---|---|---|---|---|
| No design checks logged yet — added when the job enters Design. | ||||
Materials against this job
Consumed cost $0| Material | Lot | Qty | Waste | Cost | State |
|---|---|---|---|---|---|
| No materials allocated yet. | |||||
Workshop routing
- 1 Design
- 2 CNC
- 3 Layup
- 4 Finishing
- 5 QA
- 6 Complete
Activity
No activity yet.